Overseas Project
Total Steel Quantity: 13,000 tons
Structure Type: Steel Frame
Project Overview: This project is the Thar 2x330MW CFB Coal-Fired Power Plant Project in Pakistan. This phase includes two 330MW units, including the No. 1 boiler steel structure and the No. 1 main powerhouse structure. The thickest steel plate in the boiler steel structure reaches 150mm.

